{"id":11425,"date":"2024-09-20T09:10:59","date_gmt":"2024-09-20T09:10:59","guid":{"rendered":"https:\/\/www.geoquest-group.co.id\/?post_type=avada_portfolio&p=11425"},"modified":"2025-01-31T04:01:26","modified_gmt":"2025-01-31T04:01:26","slug":"tmf-filtration-plant-martabe-gold","status":"publish","type":"avada_portfolio","link":"https:\/\/www.geoquest-group.co.id\/en\/reinforced-earth\/tmf-filtration-plant-martabe-gold\/","title":{"rendered":"TMF Filtration Plant Martabe Gold"},"content":{"rendered":"
SYSTEM<\/p><\/div><\/div>
MSE \u2013 RE Wall<\/p>\n
Reinforced Earth\u00ae
\nWall \/ MSE Wall<\/p>\n
Back-to-back MSE
\nWall<\/p>\n<\/div><\/div><\/div>
OWNER<\/p><\/div><\/div>
PT. Agincourt
\nResources<\/p>\n<\/div><\/div><\/div>
CONTRACTOR<\/p><\/div><\/div>
PT. Anggun Permai
\nTekindo<\/p>\n<\/div><\/div><\/div>
CONSTRUCTION YEAR<\/p><\/div><\/div>
10\/2022 to
\n02\/2023<\/p>\n<\/div><\/div><\/div>
DESIGNER + CONSULTANT<\/p><\/div><\/div>
New development of TMF Filtration Plant is planned on sloping rocky slope. Existing site has insufficient area for whole plant development.<\/p>\n
Additional fills are needed to widen area for plant development.<\/p>\n
MSE Wall is proposed by GRM as the retaining system for the additional area.<\/p>\n
Part of proposed TMF Filtration Plant is planned as a storage of filter cake area. This storage structure is located near MSE Wall.<\/p><\/p>\n<\/div><\/div><\/div>
Foundation soils under MSE Wall varies in the elevation and consistency. Part of MSE Wall is constructed on competent layer (Rock; SPT-N > 50).<\/p>\n
Filter cake storage is designed using cantilever wall along with shear key.<\/p>\n
Due to the scarcity of granular material, sand material is used as the technical backfill material.<\/p>\n<\/div><\/div><\/div>
ReCo designs MSE Wall using Reinforced Earth\u00ae Wall specification. Total facia of Reinforced Earth\u00ae Wall is 1,237 m2.<\/p>\n
Under filter cake storage, Reinforced Earth\u00ae Wall is designed with higher tensile strength of reinforcement to accommodate Filter Cake high load. In addition, Back-to-back MSE Wall is designed as retaining earth wall in front of Filter cake stockpile structure.<\/p>\n
In the reinforcement zone, combination of Geosynthetic GeoStrap\u00ae and Geogrid are proposed to minimize wall lateral deflection due to sandy type backfill material.<\/p>\n<\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"
TMF Filtration Plant Martabe Gold Location : North Tapanuli, North Sumatera, Indonesia<\/p>\n","protected":false},"author":5977,"featured_media":11451,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"portfolio_category":[356,357],"portfolio_skills":[],"portfolio_tags":[],"class_list":["post-11425","avada_portfolio","type-avada_portfolio","status-publish","format-standard","has-post-thumbnail","hentry","portfolio_category-case-study","portfolio_category-retaining-walls-case-study"],"yoast_head":"\n