{"id":11514,"date":"2024-09-26T11:34:11","date_gmt":"2024-09-26T11:34:11","guid":{"rendered":"https:\/\/www.geoquest-group.co.id\/?post_type=avada_portfolio&p=11514"},"modified":"2024-10-10T07:53:33","modified_gmt":"2024-10-10T07:53:33","slug":"design-material-supply-on-site-casting-and-construction-of-reinforced-earth-wall-structures-for-philippines-cebu-airport","status":"publish","type":"avada_portfolio","link":"https:\/\/www.geoquest-group.co.id\/en\/reinforced-earth\/design-material-supply-on-site-casting-and-construction-of-reinforced-earth-wall-structures-for-philippines-cebu-airport\/","title":{"rendered":"Design, material supply, on-site casting, and construction of Reinforced Earth\u00ae wall structures for Philippines\u2019 Cebu Airport"},"content":{"rendered":"

Design, material supply, on-site casting, and construction of Reinforced Earth\u00ae wall structures for Philippines\u2019 Cebu Airport<\/h2>\n<\/div><\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>

Project Details<\/h3>\n<\/div><\/div><\/div><\/div><\/div>

SYSTEM<\/p><\/div><\/div>

True Abutment<\/p>\n<\/div><\/div><\/div>

OWNER<\/p><\/div><\/div>

Mactan Cebu International
\nAirport Authority<\/p>\n<\/div><\/div><\/div>

CONTRACTOR<\/p><\/div><\/div>

Megawide \u2013 GISPL
\nConstruction JV (MGCJV)<\/p>\n<\/div><\/div><\/div>

CONSTRUCTION YEAR<\/p><\/div><\/div>

July 2018<\/p>\n<\/div><\/div><\/div>

DESIGNER + CONSULTANT<\/p><\/div><\/div>